Kanban’s core is based on a paradox. By limiting how much work we do, our productivity increases.
Multitasking, or task switching as it is more commonly known, can be a time-consuming activity that can lead to lost productivity.
David J. Anderson best described its application to software engineering in 2013 in the foundational book Kanban: Successful Evolutionary Changes for Your Technology Business. However, its widespread adoption isn’t as widespread as Scrum’s in early Agile software development. Kanban is a liberating alternative for teams frustrated by the Scrum process.
Kanban’s origins
Even though it was only recently adapted for knowledge work, the concept of Kanban (lowercase k) has existed for decades.
Toyota developed the Japanese term “kanban,” which translates to “signal cards,” in the 1940s. Toyota’s manufacturing team was inspired by grocery stores that stock only what they need. They began using cards (or kanbans) to indicate to other areas of the production line that more parts were needed.
Kanban was part of a JIT approach (Just in Time). This allowed plants to make only as many parts as needed and conserve resources by not making more.
Reduce waste on the assembly line.
Let’s assume that my job is to install tires on cars. I find it wasteful to have hundreds of tires piled behind me that I don’t need.
It is very efficient for the tire-making team to make tires just in time to fit on my car. Once my stock has reached a certain level, such as 12 tires, I set up a kanban card for the tire-making crew to get them moving. The assembly line has “workers at every step of the process who cannot do work unless they have been signaled by a kanban from another downstream step.”
Kanban implementations are not typically used for software development or marketing. Instead, they include physical signal cards allowing another worker to start work.
Instead, the signal that you want to pull new work comes from the visual amount of work-in-progress in each state.
If I am responsible for editing content for my marketing team, the work in the “Edit Ready” column tells me if it is time or not to add a project to my workload. This assumes I have less than the WIP limit for the items in the “editing” column. If this is the case, I can pull in more work.
Kanban vs. Kanban
A Kanban implementation, like Scrum, requires a Prioritized Backlog of work to be done from which the team can pull their work.
Because it is the only source of work for marketing teams, business owners and stakeholders must maintain and prioritize that list.
Kanban tracking boards have been used in many different settings. However, simply having a Backlog or moving work from one side to the other on a whiteboard does not mean you are using Kanban. Anderson reminds us that “card walls” are not necessarily kanban systems. They can be used as visual control systems. They enable teams to see work-in-progress and organize themselves.
It is only a Kanban system if the work-in-progress is unlimited and there is no signaling to pull work through it.
You don’t have to put a lot of cards up on a wall to use Kanban.
Many Scrum teams use this visualization to manage their work. Kanban’s main feature is its commitment to limiting work-in-progress.
WIP Limits: The Cool Power
A Kanban team uses WIP limitations to manage their work instead of timeboxes like a Scrum team. Each state of work can only contain a certain amount of productive work.
Waste enters the system when the team exceeds this limit. This becomes part of the Kanban process.
WIP limits can vary from one team to the next and from one work state to another.
A team of five might have a maximum WIP limit of 10, which allows each member to work on two things simultaneously. The work being reviewed might have a different limit depending on the length of the piece, how many people are involved in reviewing it, and other factors.
It would be best if you regularly experimented with your WIP limits to ensure your Kanban system works at its best.
Kanban is not like Scrum. It doesn’t set a method for managing work. Kanban doesn’t require regular meetings or creating roles in the team.
Kanban assumes you have a work-management system and are keen to improve it. Kanban is more accessible to implement than Scrum, as you can start Kanban without any education.
Kanban is flexible enough to adapt to changing situations. Kanban is implemented differently by any two teams, even within the same department. This is understandable: each group has its workflow, so every team’s improvement strategy will be different. Anderson finds this approach liberating.